1.
Fauth J, Wu L, Chen J, Lu W, Brilakis I. Streamlining the Building Permit Process with Modular Integrated Construction (MiC): A SWOT Analysis from Hong Kong. ABC2 [Internet]. 2025 Dec. 31 [cited 2026 Jan. 24];2025(02):90-8. Available from: https://abc2.net/index.php/journal/article/view/22